Gemini created these notes. They can contain errors so should be double-checked. How Gemini takes notes
Drag image to reposition
Outline
Outline
Document tabs
VETRO FAQs and Portal User Instructions.docx
0
Headings you add to the document will appear here.
What is the State-Led Challenge Process?
2. How do I become a challenger?
3. What is the Challenge Portal?
4. How long do I have to file a challenge?
5. My location says it is BEAD ineligible due to an enforceable commitment. What does that mean? Can I still file a challenge?
6. The location's dot is gray, but the service is below 100/20 Mbps. Why is it saying it is served, making it ineligible for BEAD funding?
7. What evidence is required to support my challenge?
8. What evidence file types will be accepted as evidence?
9. How large can each evidence file be?
10. Can I submit more than one evidence file at a time?
11. What kind of evidence can be given to show that our company provides service to multiple locations?
12. Any other guidance on evidence files?
13. If I submit a challenge to my own service area do I need to provide a rebuttal?
14. What will our choices be when selecting the technology challenge?
15. How would we claim projects that would be completed before December 31, 2024?
16. Is there any way to submit a bulk challenge?
17. How do I challenge a location my company serves? The Availability challenge options don't apply.
18. Why was my challenge rejected?
19. I'm having trouble accessing the Availability Map, and am asked to sign in.
20. Which version of the map is being shown?
21. We noticed that some of the CAI locations in our area list their service at 0/0 Mbps. How do we correct their listing to claim they are offered broadband at the “served” speeds?